Frequently Asked Questions




Q: When do I need to get a building permit?
A:
Generally, prior to constructing, enlarging, altering, repairing, moving, removing, demolishing, or converting and building any structure.

Q: Do I need a permit to build a fence?
A:
A permit is necessary for any fence over six feet in height.

Q: Do I need a permit for a patio or deck?
A:
A permit is necessary if the patio or deck is 30 inches or more above grade.

Q: How do I apply for a building permit?
A:
Permits are issued by the Building Department at 248 Main Street, Soledad CA. 831-678-3963

Q: What documents and drawings do I need to submit? What is the process to obtain a building permit?
A:
See Building Permit Submittal Requirements

Q: How long is the review process once I submit documents and drawings?
A:
It depends on the project.

Q: How much does a permit cost?
A:
Generally, the cost of a building permit is based on the valuation of the proposed project based on the size of project, type of construction and building materials. When you submit drawings and details please provide the above necessary information.

Q: How long is the permit valid?
A:
Once issued the building permit is valid for 180 days. To keep the permit active, you need to have the Building Department complete inspections at least once every 180 days.

Q: When does the project need to be inspected?
A:
Prior to issuance of the permit, the Building Department Inspector will check of necessary inspections. In general, an inspection is required before any work is covered (i.e. before concrete is poured and insulation installed).

Q: Do I need a permit for installation or replacement of a window?
A:
The installation or replacement of a window or windows requires a permit and inspection. This includes retrofit windows in existing frames.

 